Project Details
IICS
- SF-2 to include the new 20KVA including UPS System with two battery banks
- Replacement of Filter Control System (4-PLCs) at EAF#4 Dedusting System, HADEED
- Provide Double block valves & bleeds for H2 supply at SF-II Ammonia plant battery limit and automatic block, SAFCO