Project Details
Al-Ojaimi Group
- 115kV Intertie Project for AIN MURJAN-2 and MAZROEYAH Substations in Al-Hassa
- Connection of KHALIDIYAH-3 115/13.8KV S/S (U/G Cable Portion)
- Replacement of Existing Wooden Poles 115kV OHTL between North UTHMANIYAH 52, UGOSP 1, RWPS 4, UTHMANIYAH PP, UGOSP 2 & UGOSP 6 Substations in Al Hassa Area
- Power supply to SENAYEA-2 115/13.8kV SS, (UGC Portion)
- Power supply to SHERA’A 115/13.8kV SS, (UGC portion)
- HADA-2 (ANDALUS) 115/13.8kV SS, (115kV UGC Portion)
- BAYOUNIYAH 115/13.8kV SS, (115kV UGC Portion)
- NORTH THUQBAH 115/13.8kV SS, (115kV UGC Portion)
- ALRYADHIYAH 115/13.8kV S/S, (115kV UGC Portion)
- ALBAHR 115/13.8kV Substation, (115kV UGC Portion)
- Power Supply to Recreation Center in Dammam (115kV U/G Cable Portion)
- UHUD 115/13.8kV Substation (Underground Cable Portion)
- Replacement of Old LPOF Cable to XLPE @ Shedgum # 380kV T811, T801 & T802
- Replacement of 230kV LPOF Cables in Fadhili BSP Substation
- Connection of Dhahrat Laban new SS 8293 with 132kV in Riyadh
- Replacement of Existing 69kV with new 69KV UG Cables between Qatif BSP and Safwa#1 Substation
- HADA-2 (ANDALUS) 115/13.8kV SS, (115kV UGC Portion), PTS – 23EC131
- BAYOUNIYAH 115/13.8kV SS, (115kV UGC Portion), PTS – 22EC1260
- NORTH THUQBAH 115/13.8kV SS, (115kV UGC Portion), PTS – 23EC1012
- ALRYADHIYAH 115/13.8kV S/S, (115kV UGC Portion), PTS – 23EC129
- ALBAHR 115/13.8kV Substation, (115kV UGC Portion), PTS – 23EC134
- UHUD 115/13.8kV Substation (Underground Cable Portion), PTS#23EC111
- Replacement of Old LPOF Cable to XLPE @ Shedgum # 380kV T811, T801 & T802, PTS#AMDH-22-02
- Replacement of 230kV LPOF Cables in Fadhili BSP Substation, PTS#22-JAMD-02
- 380KV EHV Cable Works - 380KV Hajer-2 (Qurrayyah) Switching Sub-Station Project