Project Details
Al Haider Company
- Two (2) new 132kV D/C OHTL from cut point of existing OHTL 9006-8602 to Proposed AL-DWADMI S/S # 8616
- New 132kV DC OHTL from BSP # 9037 to the Proposed AL-DWADMI S/S # 8618
- Two (2) new 380kV D/C OHTL from cut point of Existing/Ongoing OHTL 9095-9059 to the proposed Tawilah Wind#9106, PTS-24CO3058
- Power Supply to New 132/13.8kV S/S for Judaydat Arar Border Port Project – Arar Area (OHTL Portion)
- Power Supply to HAFAR AL-BATIN Industrial City Project 115/33kV
- Installing Replacement of Existing Wooden poles 115 kV OHTL between Rafeah and Ash Shamlul
- Retrofitting of Limited Capacity and High Attenuation OPGW in Taif Area – WOA
- Retrofitting of Limited Capacity and High Attenuation OPGW in Madinah Area – WOA
- Rehabilitation/Replacement and new Installation of OPGW
- Rehabilitation / Replacement / Retrofitting and New Installation of OPGW in SOA
- Two (2) 380kV D/C OHTL Loop In and Out to Establish BHUR BSP – TBK BSP and BHUR – Tabarjal
- Relocation of 380kV OHL line S/S 9021, S/S 9022 & S/S 9040-9013 Beside Qiddiya Boundary
- Relocation and Removal of Overhead Power Lines for SPARK-Eastern Peripheral Road Project.
- Retrofitting/ Replacement of Old OPGW in National Grid – COA Phase-3
- Retrofitting and Replacement of OPGW along 230kV & 380kV T/Line in EOA
- Installation of 115kV Underground Cables for the Integration of Khalidiyah-2 115/13.8kV S/S
- Installation of 115kV Underground Cables for the Integration of Khalidiyah-2 115/13.8kV S/S Conversion of Portion of Existing Single Circuit Overhead T/L (QAISUMAH P/P – SADAWI S/S) to UGC
- Installation of 115kV U/G Cables for the Integration of Aziziyah – 3, 115/13.8kV S/S
- Installation of 115kV Underground Cables for the Integration of Al-Mazroeyah 115/13.8kV S/S
- Installation of 115kV Underground Cables for the Integration of Ain Murjan 115/13.8kV S/S
- Two (2) 380kV D/C OHTL Loop In and Out to Establish BHUR BSP – TBK BSP and BHUR – Tabarjal, PTS#18WO310
- Power Supply to HAFAR AL-BATIN Industrial City Project 115/33kV, PTS#22EO1019
- Installing Replacement of Existing Wooden poles 115 kV OHTL between Rafeah and Ash Shamlul, PTS#22EO1229
- Power Supply to New 132/13.8kV S/S for Judaydat Arar Border Port Project – Arar Area